Case Studies: House in Waterford

Front view of a semi detached home in Waterford
Image of property

This house was constructed in the 1970s as a single story residence with very low insulation values. In 2006 the new owners embarked on a major renovation project and engaged Robert Burke Construction Ltd. to undertake the task. Conservation of energy was high on their agenda. Robert’s company is also a Powerwall trained contractor.

The Solution

The renovations were constructed in single skin masonry and Powerwall System 1 External Insulation System. The decision to use 100mm Powerwall P.I.R. Insulation Board, to achieve a U-Value of 0.20W/m2K, was chosen for its high thermal conductivity and track record as an insulation for external rendering requirements.

The 100mm Powerwall P.I.R. Insulation Board was mechanically fixed, to the masonry wall, with 150mm Powerwall Mechanical Fixings. The insulation was then coated with 3/4mm of Powerwall Adhesive Coat into which Powerwall Alkali Resistant Mesh was embedded to encapsulate the complete façade of the building. After initial set a second coat of Powerwall Adhesive Coat, 2/3mm was applied to provide an even substrate for the finish render.

Powerwall Classic Stone magnolia, one coat coloured through render at 15mm thickness, was chosen for its waterproofness and speed of application to give an aesthetic finish for the construction.

Client Comments

“Another project to be proud off” says Michael OSullivan, project manager for Robert Burke Construction.